Galt House Project

Galt House Project - Catastrophic Service

  • Full service hotel with restaurant, 25 floors

The Project

  • Catostrophic electrical service due to 2 fires within several days of each other
  • No power between 3rd floor and 25th floor
  • Happened during winter, weather was 5 -10 degrees
  • Keep the hotel running

The Result

  • Temporarily restored power through mobile generators, 34,000 feet of temporary wiring and temporary penetrations
  • Designed and installed new lighting and heating busways
  • Re-energized hotel and closed out all temporay work, including removing wiring and fire sealing penetrations
  • Project completed in 3 months
  • Hotel remained functioning, saving business and money

 

 